Difference between revisions of "Scientific Breakthrough"
m (Fixed some info) |
Brian Damage (talk | contribs) |
||
Line 10: | Line 10: | ||
=Walkthrough= | =Walkthrough= | ||
− | + | The Scientific Breakthrough line of missions are simple but involve a slight amount of travelling. A suspicious looking nano will be applied upon taking up this mission, and you must proceed to the mission marker on your map to complete the mission. Upon entering the same field as your mission objective, a DoT will begin to eat away at your health, damaging you for 100 points every 6 seconds or so. As such, it may be strategic to get a Fixer-Grid to get you as close to your objective as possible to minimize damage. | |
+ | |||
+ | Quickly proceed to your mission marker and speak to the NPC in the vicinity of the area. He/She will remove the virus from your NCU after having a quick chat with you, while completing the mission at the same time. | ||
+ | |||
+ | Difficulty: Easy | ||
+ | |||
+ | Approximately time taken for run: 10-15 minutes | ||
=Quest description= | =Quest description= |
Revision as of 15:37, 13 June 2010
Overview
Test and deliver experimental nano program to client.
Rewards
- variable XP.
- 4 Mission Tokens
Walkthrough
The Scientific Breakthrough line of missions are simple but involve a slight amount of travelling. A suspicious looking nano will be applied upon taking up this mission, and you must proceed to the mission marker on your map to complete the mission. Upon entering the same field as your mission objective, a DoT will begin to eat away at your health, damaging you for 100 points every 6 seconds or so. As such, it may be strategic to get a Fixer-Grid to get you as close to your objective as possible to minimize damage.
Quickly proceed to your mission marker and speak to the NPC in the vicinity of the area. He/She will remove the virus from your NCU after having a quick chat with you, while completing the mission at the same time.
Difficulty: Easy
Approximately time taken for run: 10-15 minutes
Quest description
Your assignment is to test experimental software prototypes- Testing is simple, as all you need to do is have (and keep) the software nano running in your NCU.
Time is of the essence, as these experimental formulas are usually highly unstable. It will be in your best interest to go to the client responsible for the product as soon as possible.